
and then a bit of lathe work with two pieces of alloy clamped together and drilled through to accept the hoses and through a different side for a mounting/clamping bolt. Ideally I would have drilled the chassis and used rivnuts, but due to lack of space (can't get the drill in straight) nuts were welded on the chassis rail and recesses made in the underside of the clamp to make it sit flush.
A good day was then spent fitting the clamps to the chassis, each one having to be fettled slightly to sit over the weld and also support the brake line.


The un-supported copper pipe is the existing fuel supply to the carbs. fitted up just to keep the car mobile as work proceeds.
Then up front, just before the toe board outrigger, a couple of supports have been welded on for the right angle hose fittings, which take the fuel to/from the metering unit.

No comments:
Post a Comment