Saturday, November 29, 2008

Upwardly mobile

After almost three years of ownership I finally got my GT6 out for a MOT and even better, it passed first time with no advisories, just positive comments from the tester about the CV conversion on the rear and the condition of the underside.

Though to put a bit of a damper on it, I did have to pull over on the way back as the car mis-fired and refused to start again, so it was up with the bonnet. As I lifted the distributor cap off, the rotor arm was not in it's proper place, so I am guessing it may have jumped out?
I shall see if I can fit a Lucas dizzy for possibly increased reliability over the old Delco unit, but the next major job for me will be getting the Megajolt system built up and fitted.

It's great to have it almost on the road, though I still need to get the tax applied for, but there is not too much of a rush as I had been hoping to fit a new water pump before the MOT, unfortunately it has still not been delivered. Apparently the address or telephone number on the package was not correct or clear enough, so the courier could not deliver it or contact me, should have gone to Fitchetts really as I know they always get parts out to me next day, oh well, we live and learn. The plan now is to try and get it to run something like right as the carbs still need balancing & adjusting and then go out and put some miles on it.

It is a bit of a shock to the system as I had not driven a small chassis Triumph in anger for over a year, it does feel a lot more steady now on the 175 tyres compared to the 155's I had on it before I went off for the MOT.

Wednesday, November 26, 2008

New Arrivals

Last week the new chassis for the Lightweight was delivered, ready modified to take the 200tdi engine and fully galvanised, so it ought to last a few years. Unfortunately, work on the Land Rover will be slow for a bit as we wait for some reasonable weather to get the remaining bodywork cleaned off and painted. Added to this the replacement springs, new parabolic ones, are not expected to be delivered until Christmas, so we cannot start building up the new chassis until we get those.


Later on in the week, a couple of guys came out to fit a new windscreen in the GT6. Seeing as a new screen from Moss would be close on £110, I thought that the deal I got was not too bad as two guys came out to fit it, taking 45 minutes to do the job, only cost me £100. I can't help but think they did not make much of a profit on that job.

Meanwhile, many of the smaller jobs required to get the GT6 through a MOT have been completed, with the screen wash system plumbed in and lined up and a exhaust system sealed up and clamped down.
A slightly more long-winded job was in the making of an air box. When I did the bulkhead modifications many months ago it was my intention to fit a modified Spitfire air box, not ideal I know, but it is a starting point.

Instead of trying to fill in the old holes in the Spitfire back plate and to make alignment of the new holes much easier I decided to pull apart an old GT6 air box and weld that to the back of the Spitfire one. It all looks a bit agricultural at the moment but it should at least see me onto the road. I just need to find some suitable filters to go over the end of the tubes and then it should be good to go until I get round to making something better.

Tuesday, November 18, 2008

Steps forward

I’ve been having another bash at the GT6, with a view to getting it MOT’d and on the road before the end of the year. Most of the big jobs that needed to be done before it had any chance of passing a MOT had already been completed, so now it has come to working through the long list of minor jobs.

One job that did cause a bit of a headache for a time was trying to get all of the lights working. With a bit of vigorous wobbling around of the bulb holder I was able to get the bulb to work for a time, but not to a point I would trust it for any length of time.
I decided to take the holder apart to clean it up and see where the weak link was. They seem to be failing where the negative contact for the bulb should mate with the larger which holds the assembly to the light unit. I have tried cleaning it all up and re-assembling it again, but that does not seemed to have improved it much.
To work around this, I ended up drilling through the two negative contacts and with the addition of a small screw, it holds the two contacts together so much better.
After getting a few other jobs out of the way, I have returned to fitting the new speedo, spending some time fabricating a bracket to hold the pick-up sensor on the diff. The bracket was built-up on the bench using a spare diff to make sure it all fitted properly before transferring it to the car. As the suppliers suggested, the propshaft bolts have been replaced with cap head ones to aid the pick up sensor.
Over the next few evening I hope to get the speedo wired up, just need to run power lines to the pick-up sensor and speedo head from the fuse box, connect the data line from pick-up sensor to the speedo and wire in the warning lights.

For the MOT, the car will just have the one seat fitted for a couple of reasons, I have not round to fitting the second seat to it's runner yet and as I have not been able to enguage the overdrive at speed yet, I would like to know it works before fitting the seat and hence making removal of the gearbox tunnel much harder.

I should have someone coming in later this week to fit a new windscreen, the current one might pass the MOT but it has so many minor scratches that it would annoy me all too quickly. Then that just leaves the screen wash system, front chassis over riders and front number plate to be fitted up before I consider booking in for a MOT.

Tuesday, October 21, 2008

Lightweight bulkhead repairs

With the Lightweight back in the barn I have been able to crack on with some remedial work on the lower bulkhead and it's mounting. On the passenger side, close to where it mounts to the chassis, the main bulkhead rail had suffered quite badly to corrosion. Initial thought were on how best to repair it, but the more I poked away at it, the less savable it became.

Wanting to get it done right and not have to come back to it again in a few years time, I took the decision to fabricate a new lower section to replace the heavily corroded part. Although the final piece is to be a channel section, I started off with a length of 2" box section as this was what was to hand and could ofcourse be cut down to size. Using the lathe a hole was soon bored close to the bottom to accept the lower mounting point/spreader tube, which was then welded in.

In an attempt to make sure every thing lined up, a basic jig was made up from a piece of Dexian, which seemed to work quite well as it already had all the holes in it I required.

Old and new bulkhead sections side by side

Old piece removed

New piece in, welded and painted

Outer panel also fitted.

Wednesday, October 15, 2008

RBRR 2008

Woops, a bit of updating needed here.

The RBRR has been and gone, but I'll back track a bit first. As mentioned in my last post, I got myself and fitted a pair of re-conditioned control arms. The effect of fitting these was to tighten up the front end, but unfortunately at the same time it knocked the tracking out of alignment as it had put the suspension geometry back in the right place after having dropped partly through the old rubber bushes.


With the tracking re-done there was not much else to do in preparation for the RBRR other than put a basic tool kit together, grab a few spares, then give the car a polish and add the car stickers.
Joining me on the run was Bruce Sellers, aka GT6Boy, aka MotherTheressa and Nikolaj Blomberg, aka Nick B, who flew in from Copenhagen to do the run, whom I met for the first time at the start of the run a few hours before the start.

I've not that much to report from the run, we drove on some good and at times challenging roads, oh, and it rained a few times. The car generally behaved itself, with us only having to stop once to fix a wire up to the overdrive switch, which had failed close to a crimp joint and that was made good again using a inline connector I had in the spares.

With the run and travelling to the start from South Wales, the car covered about 2,300 miles, returning about 32mpg, not too bad for a 42 year old car I thought.

Since getting back from the run the car has been de-stickered, washed and waxed again, but that's about it for now. The Lightweight Land Rover has returned, so I can see a few hours going into that again soon.

Thanks to Nick Jackson for this last picture and there are more pictures from the run, taken by Nick B here

Sunday, September 21, 2008

This and that.

Time for an update me thinks, a couple of weeks ago I took the 2000 saloon off for it's MOT and it passed with only one advisory, a nail in one rear tyre, so that'll have to get changed before the RBRR. Another re-con propshaft has also been fitted, as the one on there was starting to rumble at around 70mph. Leaving the only other job I would like to do before the run, being a front suspension control arm as I think there must be some slack in it as there is still some steering shake when braking hard or hard cornering at speed.
With the GT6 gearbox tunnel almost finished, I turned my attention back to the Lightweight for another bash at it. The main chassis rails have now been welded up and a start made on the bulkhead repairs. Meanwhile the old series engine and gearbox has been lifted out so we can clean up the bulkhead in preparation for painting and removal of the old redundant military wiring.
Th remains of the Lightweight have now gone off to a local garage to have the front axle re-built and the differential crown wheel and pinions taken from a Landrover Discovery, which is also to donate it's engine.
Once it gets back there will still be some welding required to fit new outriggers for the bulkhead and a fuel tank outrigger.



Woof!

Thursday, August 28, 2008

Bit more tunneling and brakes

With the new CV boots on the GT6 it was time to set up the rear brakes, with the manual brake adjusters taken up to just before the brake shoes bit. Wishing I had done it when the body was separated, I set to replacing both handbrake cables, the rear one having stretched two inches, removing any scope for adjustment.
I replaced the rear brake cable on my old Spitfire a few years ago and find that to be a right pig of a job, but the GT6, having the cable guides on the body instead of the chassis, was a lot easier to do as you can get your hand through the opening in the body for the top of the differential to help guide the cable through. After threading it through the rest of the guides, it was covered in grease and worked back and forth a few times to help spread it along the guides.

Further forward, I bit the bullet and got to completing the gearbox tunnel. It was a job I was dreading, as I knew it would involve a lot of fitting and re-fitting if I was going to have any chance of it fitting properly.

First fit:


Clamped down ready for first welding:


Partially welded:


Copleted-ish and painted:


Inside coved with reflective sound deadening:


Meanwhile the 2000 saloon has been receiving a bit of attention as a few weeks ago I noticed a bit of slack in the steering of my MkI 2000, but recently it got worse and instead of it being a track rod end, as I thought it might be, it turned out that the slack is due to the coupling adaptor at the bottom of the top steering column.
So I striped out the steering columns, after removing the upper pinch bolt, the upper column sipped round in the joint all too easily. I thought the column was going to be a pain to get out, having had to remove the one in my GT6 a few times, but the saloon was a lot easier, once I had the indicator unit out.
The evidence was clear to see:


Fortunately, I had a spare steering column from the spares front end, which came with the car, so that was fitted in place, along with the intermediate shaft. The whole lot is much better and tighter now, just as well as the MOT is due in a few weeks and then after that, 2000 miles of the RBRR.