With the plate on it meant I could get the new duplex timing chain on, mating up with the wider tensioner. The old head was sat on the block and then the water pump and inlet manifolds were also fitted, as much as a moral boost and clearance check then anything else.
With the water pump on I was able to carefully remove one of the water take-offs. This is no longer required as it was used to pass water through inlet manifold, this is not needed or wanted when using the injection throttle bodies.

Next jobs will be to get the fuel pipework in place and then have a go at timing up the distributor and the metering unit, should be interesting.
No comments:
Post a Comment